this blog is a record of the house that I helped to build along with my class during the Carpentry pretrade course I did at SIT chch

Thursday 3 May 2012

Windows and doors

At this stage of the build we are cutting out the window and door holes and applying flashing tape then fitting the windows and doors.

flashing tape on the window opening
windows on the south side of the house
window from the inside
first door in
temp brace with packing between window frame and prop stud
packing under the door sill
bringing in the next window
preparing to lift it in
window in place, note cavity batterns on the walls

No comments:

Post a Comment