this blog is a record of the house that I helped to build along with my class during the Carpentry pretrade course I did at SIT chch

Thursday 26 July 2012

House renovation

One of the jobs that i have recently been involved with is a house reno, this involved removing a fireplace and existing wall, opening the floor and installing an extra load bearing pile.
then the wall was reinstalled with a door where the fire place was, the walls were brought up to current bracing standards then relined them with bracing GiB.
we also removed a window and replaced it with a new aluminum unit.
the brick fire place
Me taking it apart
the wall behind the fireplace to be removed
opening up the floor
wall lining removed and floor open
fireplace exposed
new pile in
new steel beam in to replace wall
Lath and plaster walls
fitting new bracing GiB
new wall with new door 
GiB on
removing plaster around window
window removed
window rough opening to be reframed
new window in.