*House subfloor-This is the start of the house that we are building as part of the pretrade course, this first part cover the subfloor and flooring.
| setting out for the foundation |
| Me at the start of the build |
| me ripping down perimeter joist |
| framing up sub floor |
| me ripping again |
| and again |
| Perimeter joist with bearer |
| perimeter joists with bracing |
| inside of perimter |
| laying down center bearer |
| putting in the floor joists |
| floor joists |
| the whole class busy |
| floor joists on bearer with packing |
| canterlever section |
| making sure it's level |
| joist hangers with packers for fixing poly brackets |
| me with sub floor |
| all the joists now in |
| fixing for joist |
| poly brackets in |
| underfloor poly |
| start of the flooring |
| H 3.2 ply for bathroom |
| me during flooring |
| flooring going down |
| whole class doing the floor |
| the finshed floor |