We cut and layed out the top and bottom plates, marked out the studs, prop studs, trimmers, windows and doors etc.
We then cut all the cut and assembled them.
once they were assembled we started standing them a room at a time and then added temp bracing.
laying out top and bottom plates |
starting to build |
some finished frames |
first frames to go up |
building frames |
the bedroom I helped build |
James our tutor inspecting the work |
James showing us how to fix top plates |
starting to look like a house |
another frame going up |
and it's in place |
Here I am with the room I helped build |
Me using nail gun |
strapping on Lintel |
start of the hallway |
lifting in one of the main Lintels |
and it's in place |
more bracing |
ceiling batterns |
the finished hallway |